| Author |
Message |
|
2006/08/31 22:00
|
|
|
Elbert
Joined: 2006/08/31
Messages: 7
Offline
|
|
|
|
Making a sub-process of a group a number of tasks, gateways and process flows gives me a problem:
All the process flows are disappeared
That makes reorganising the process diagram a pain in the but.
|
|
|
|
 |
| |
|
2006/08/31 22:11
|
|
|
Elbert
Joined: 2006/08/31
Messages: 7
Offline
|
|
|
|
Addition to the previous message.
When I start redrawing the process flows they appear as double lines.
I turned out that the original flows became visible?
How is that possible and how can I avoid it
|
|
|
|
 |
| |
|
2006/08/31 22:26
|
|
|
Elbert
Joined: 2006/08/31
Messages: 7
Offline
|
|
|
|
Another addition:
The flows become visible after clicking Layout/Route Connectors.
The problem then is that the gateways change size and the connectors change position which give the decision in the gateway a totally different meaning and outcome
|
|
|
|
 |
| |
|
2006/09/01 17:50
|
|
|
Jick
Joined: 2005/04/29
Messages: 2880
Offline
|
|
|
|
|
 |
| |
|
2006/10/17 19:30
|
|
|
Elbert
Joined: 2006/08/31
Messages: 7
Offline
|
|
|
|
Hi Jick,
I did the following:
1: New BP Diagram
2: Add start event and draw 3 steps with connectors and end event.
3: With the mouse pointer draw a selection rectangle
4: Right click on one of the steps and select "Form Sub Process Diagram"
Then the 3 steps will be visible in the lower level diagram. Without the connectors.
The connectors will be visible after clicking Layout/ Route Connectors.
Before I did the route action I drew new connectors. That's why they appeared double after I did click (for some reason) on Layout/ Route Connectors
regards
Elbert
|
|
|
|
 |
| |
|
2006/10/17 19:36
|
|
|
Jick
Joined: 2005/04/29
Messages: 2880
Offline
|
|
|
|
Hi Elbert,
Your steps are very helpful. I am able to repeat the problem now. I am going to ask our engineers to fix this problem, and will post there result here afterwards.
Best regards,
Jick
|
Visual Paradigm International Ltd.
http://www.visual-paradigm.com
Build Quality Applications Faster, Better and Cheaper |
|
|
|
 |
| |
|
2006/10/18 08:58
|
|
|
Jick
Joined: 2005/04/29
Messages: 2880
Offline
|
|
|
|
|
 |
| |
|
2006/11/11 18:02
|
|
|
Jick
Joined: 2005/04/29
Messages: 2880
Offline
|
|
|
|
Dear Elbert,
A new build of VP Suite is ready. Since you have been asked to apply a hotfix, please run the updater inside the vp-suite-install-dir/bin to upgrade the tool to the latest release.
Please feel free to let me know if there is a question.
Best regards,
Jick Yeung
|
Visual Paradigm International Ltd.
http://www.visual-paradigm.com
Build Quality Applications Faster, Better and Cheaper |
|
|
|
 |
| |