Work Breakdown Structure usage

Hi, Is there any way to un-pin or de-magnet the levels and boxes that automatically only spread vertically lower and lower versus horizontally?

Thanks.

Hi,

One way would be to use a generic connector between elements rather than the BSConnector.

image

1 Like

Breakdown Structure Diagram not yet support turn off layout.
I passed your message to development team as feature suggestion.
Once the suggestion is implemented, you will be informed.

2 Likes

I would like to let you know our engineers implemented Descendant Layout for Breakdown Structure Diagram in Visual Paradigm 15.2.

Details about upgrade to 15.2 can be found at

1 Like

Thank you so much! Really helps with organising the layout.