I created a new process-diagram in BPVA 1.1 sp1_20060811 and dragged it from the Diagram Navigator into another diagram where it diplays as a sub-process, which is what I wanted.
Then I noticed that the new diagram is listed as a pool in the Model navigator. I instead wanted it to be a sub-process in my main diagram. Is there a way to remove the pool specification so my new diagram is just an exploded sub-process?
Dave
:shock: