# Simulation with visual paradigm

**URL:** <https://forums.visual-paradigm.com/t/simulation-with-visual-paradigm/16550>\
**Category:** Bug Reports\
**Tags:** bpmn\
**Created:** [January 10, 2021, 8:55am UTC](https://forums.visual-paradigm.com/t/simulation-with-visual-paradigm/16550 "2021-01-10T08:55:44Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![afsaneh.ro](https://avatars.discourse-cdn.com/v2/letter/a/71c47a/32.png) [@afsaneh.ro](https://forums.visual-paradigm.com/u/afsaneh.ro)\
**Post date:** [January 10, 2021, 8:55am UTC](https://forums.visual-paradigm.com/t/simulation-with-visual-paradigm/16550/1 "2021-01-10T08:55:45Z")

</div>

Hi  
I’m simulating a process. I have allocated resources, time, cost, and process paths and etc. It gives me 1 time after simulation.  
The initial time does not change with the change of resources, instances and other parameters of the bottlenecks. Why?

---

<div class="post-metadata">

**Author:** ![Jick](https://avatars.discourse-cdn.com/v2/letter/j/ea666f/32.png) [@Jick](https://forums.visual-paradigm.com/u/Jick)\
**Post date:** [January 11, 2021, 12:54am UTC](https://forums.visual-paradigm.com/t/simulation-with-visual-paradigm/16550/2 "2021-01-11T00:54:42Z")

</div>

Dear Afasaneh,

Thank you for your post. May I get your project file and log file for checking? Please upload to:  
[https://files2.visual-paradigm.com/index.php/s/TWlSX8KHZ4NbRx0](https://files2.visual-paradigm.com/index.php/s/TWlSX8KHZ4NbRx0)

You can export the log file from the About window (Help \> About).

Best regards,  
Jick Yeung
