Can't Copy Paste Swimlanes in Visual Paradigm Standard

When I choose to add a swimlane to a Business Process model, I enter the name of the swimlane as the same name that I put into another diagram (the name is “Parent”). I expected to be prompted to reference the existing swimlane instead of creating a new one, but it just created the new swimlane. I then deleted the swimlane that was incorrectly created as a new object, and went to another diagram with the “Parent” swimlane to copy it. There is no “Copy” option in the drop-down menu when I right-click it. I’m using Visual Paradigm Standard, Version 17.1 (Build 20231101)