I was wondering how to have a report which indecates jobs of every position which is placed in lanes?
is it even possible in VP?
See help located at https://www.visual-paradigm.com/tutorials/define-bpd-working-procedures.jsp
I was able to do it by dropping a loop template on my document, and using the “Business Process Flow - Activity Information” template for the “Task” model type.